The shipping units you entered are copied as a shipping proposal. If no complete shipping unit can be set up for shipping, the rounding quantity should be reset to 0 for the position of the delivery plan on the overview. There are two types of delivery plan unlocking: can someone tell me in detail the difference between s/w JIT classifications and forecast items in a delivery plan? Please let me know in detail when you should use it and what is the advantage of both. When the rounded quantity field is maintained in the delivery plan, the delivery quantity is rounded to allow the delivery of complete shipping units. If a different change state than the delivery plan is copied, this can be corrected by selecting the delivery position and choosing the menu item —> status. Corrections to shipping units, i.e. to the proposed packaging, can be made with Edit –> Packing. In shipping, delivery plan deliveries for component suppliers are built based on the delivery plan or JIT delivery plan. Relevant engineering statements are copied into delivery plans when maintained there. Shipping units (for packaging purposes) are also set up automatically, taking into account the quantity delivered and the instructions in the delivery plan. A futures contract contains details about a delivery plan, but a contract only contains information about volumes and prices and does not indicate specific delivery dates In the subcontracting industry, there are usually rules about how and how much a material should be packaged.
To enter such a proposal, go to the summary table of delivery plans. In the field, enter the quantity of the item to be packed. Select Edit –> packaging suggestion to access the packaging screen. For more information on packaging, see the packing note in shipping. The functions described therein can also be used in the delivery plan. (1) – Appointments allow you to have 2 different rates of tariff headings (VBEP-ABART). To create a delivery plan with the delivery plans, follow these steps: To compare different generations of delivery plans, select Edit –> Visual analysis by editing or viewing the delivery plan. You access the analysis image that displays on the left all delivery schedule generations and, on the right, all JIT delivery schedule generations, from the current delivery plan above. Each IDOC is transferred to the application by workflow. The IDOC is opened in the application modules and the data it contains is imported. The client is identified in the SAP system by the imported data.
Any specific processing necessary for this part sold is imported. These accesses must be defined in customizing. If no adjustment is made, the IDOC cannot be scheduled. The system then attempts to determine an appropriate delivery plan. If a particular delivery plan can be established, the IDOC is planned in the background. If no delivery plan can be established or if there are general development errors, an email is sent to the inbox of the competent user. The IDOC must then be processed from the email (foreground online processing for error messages or display of warnings/notes). 2.
The cumulative quantities shall be monitored and influenced by the way in which the plan agreement reflects both forecasting and dispatch requirements. Cumulative quantities are an essential tool for getting an accurate picture of the ever-changing business involving delivery plans and their classifications….